Myro:Air => General Discussion => Topic started by: Myro Control on April 28, 2013, 10:33:53 pm

Title: Myro:Air Production Updates
Post by: Myro Control on April 28, 2013, 10:33:53 pm
We're one step closer to launch!  The preproduction Myro:Air PCB's should be arriving this week.  If everything checks out we should be on our way... check back for photos of the boards  ;D
Title: Re: Preproduction boards arrive this week!
Post by: Myro Control on May 01, 2013, 10:17:22 am
Boards arrive today!
Title: Re: Preproduction boards arrive this week!
Post by: Myro Control on May 02, 2013, 04:37:01 pm
Boards in hand -- waiting for a few more components before powering it up.
Title: Re: Preproduction boards arrive this week!
Post by: Myro Control on May 17, 2013, 04:55:04 pm
Here (https://twitter.com/myrocontrol/status/334331187130679296/photo/1) is a sneak peak at the boards working -- you can see some modifications made  :-[
Title: Re: Preproduction boards arrive this week!
Post by: Myro Control on May 30, 2013, 01:35:50 pm
Rev 2 boards scheduled to arrive this week!
Title: Re: Preproduction boards arrive this week!
Post by: Myro Control on June 06, 2013, 04:07:46 pm
Update: http://www.myrocontrol.com/myroair/2013/06/its-gold-jerry/
Title: Re: Preproduction boards arrive this week!
Post by: Myro Control on August 21, 2013, 09:49:33 am
Our first batch of pre-production cases have shipped and should be arriving this week!  If everything checks out -- we will drop them off at the silk-screener to get the back panel markings printed, then off to certification.   If everything goes as planned, we're in the home stretch...
Title: Re: Preproduction boards arrive this week!
Post by: Myro Control on September 04, 2013, 09:00:37 am
Latest update is posted here (http://www.myrocontrol.com/myroair/2013/09/myroair-cases-have-arrived/).
Title: Re: Myro:Air Production Updates
Post by: Myro Control on March 28, 2014, 03:26:41 pm
Assembled PC Boards are here!  We got shipping confirmation for the production cases and those should be arriving in 6 days.  That just leaves final assembly, firmware installs, packing and then we ship!

We may be shipping sooner than May 1st!
Title: Re: Myro:Air Production Updates
Post by: Myro Control on April 09, 2014, 09:18:49 am
The cases have arrived!  We are assembling all the pre-orders and will be shipping within two weeks.
Title: Re: Myro:Air Production Updates
Post by: Myro Control on April 13, 2014, 07:51:49 pm
We are proud to announce we are now shipping Myro:Air.  We have limited stock so be sure to place your order.