We're one step closer to launch! The preproduction Myro:Air PCB's should be arriving this week. If everything checks out we should be on our way... check back for photos of the boards ;D
-
Boards arrive today!
-
Boards in hand -- waiting for a few more components before powering it up.
-
Here (https://twitter.com/myrocontrol/status/334331187130679296/photo/1) is a sneak peak at the boards working -- you can see some modifications made :-[
-
Rev 2 boards scheduled to arrive this week!
-
Update: http://www.myrocontrol.com/myroair/2013/06/its-gold-jerry/
-
Our first batch of pre-production cases have shipped and should be arriving this week! If everything checks out -- we will drop them off at the silk-screener to get the back panel markings printed, then off to certification. If everything goes as planned, we're in the home stretch...
-
Latest update is posted here (http://www.myrocontrol.com/myroair/2013/09/myroair-cases-have-arrived/).
-
Assembled PC Boards are here! We got shipping confirmation for the production cases and those should be arriving in 6 days. That just leaves final assembly, firmware installs, packing and then we ship!
We may be shipping sooner than May 1st!
-
The cases have arrived! We are assembling all the pre-orders and will be shipping within two weeks.
-
We are proud to announce we are now shipping Myro:Air. We have limited stock so be sure to place your order.